Fit-out and budget: what to check before the first tile goes down
Share
Save
By Alex Nekrashevich. Facts as of late November 2026. We update this article.
Useful for: anyone who has found a unit and is about to fit it out. The professional on a tight budget, the dreamer who wants it to look "beautiful", the newcomer to Finland and anyone writing a fit-out budget for the very first time.
The one-minute version
- Money spent fitting out rented premises rarely leaves with you.
- So question the walls and the lease first, and only then lay tiles.
- Multiply your whole estimate by 1.5.
- Pick fittings built for business use, not "the same as at home".
- And keep part of the budget back: you still need marketing money and a buffer covering six months or more.
Five questions to ask the walls
The costliest fit-out mistakes can be spotted before any work starts. Ask these before the first tile:
More: "Viewing commercial premises in Finland: 14 checks".
The fit-out and the lease: what stays with the owner
Tiles, walls, wiring and windows are improvements that remain in the unit. What becomes of them when the lease ends, and whether you get anything back, depends largely on the lease. Read its clauses on alterations before you start: "Commercial lease in Finland: 12 clauses".
From our own history: the video studio. We put roughly €25,000 into a basement unit in a shopping centre on the edge of Tbilisi: heating, walls, partitions for four shooting sets, lighting and ventilation. Eighteen months later the owner saw what we had built and raised the rent from €1,200 to €2,500. We left, and the deposit was never returned. A single clause we had overlooked cost us more than the entire fit-out.
Before fitting out, get these into the lease:
- a rent holiday while the work is under way (be frank: "I cannot pay full rent during the works, and whatever I invest stays with you");
- how long the rent stays frozen after your fit-out;
- what happens to your investment if the lease ends early;
- who pays for extra power and for repairs to shared wiring and pipes.
The budget: times 1.5
First-timers price walls and machines. Our experience is that hidden costs swallow half the estimate or more, so multiply the whole budget by 1.5.
These get left out of fit-out budgets:
- cleaning after the builders and taking rubbish away;
- new wiring for the equipment (a bakery oven can run for 16 hours a day);
- the sign, price labels, a touch of decor and a chair for customers;
- new locks when you move in;
- small repairs after opening: sockets, taps, pipes.
Keep something back. In cafés and restaurants we often see the fit-out and ventilation consume the entire budget, with nothing left for marketing. After the works you still need a buffer of six months or more: "What it really costs to open a local business in Finland".
Plumbing and fittings for business use
In a café, restaurant or guesthouse, taps and toilets see many times the use they would at home. A household tap soon gives up. Heavy-duty parts cost more, yet cheap ones need swapping again and again, and each swap means paying someone to remove and install. Add a "who does the job" line to the budget: whom you will call for small repairs, equipment swaps and cleaning, and what that costs.
Contractors and timing
- In our experience, when a contractor promises five days, ten is a good result. Rent may already be running during the works.
- Write a precise brief: what goes where, in which colour, which sockets and how many. A spoken agreement is almost always understood two ways.
- Hold off on big print runs of signs, business cards and flyers: if anything changes, the whole lot gets reprinted.
Equipment: buy or lease
Bought equipment fetches far less when you close. A coffee machine, as we have found, resells for a third or a quarter of its price, so leasing makes more sense. More: "Equipment: buy or lease".
Where not to cut corners
| Do not cut corners on (in our experience) | Because |
|---|---|
| checking power, ventilation and wet areas before the works | fixing them afterwards costs many times more |
| business-grade plumbing and equipment | household kit breaks and keeps needing replacement |
| reading the lease before the works | your investment may stay with the owner and the rent may rise |
| a six-month buffer after the works | without one, a lovely fit-out can close within a couple of months |
Tips by trade
Coffee shop. Water treatment and filters, capacity for the coffee machine, the air-conditioning outdoor unit (ask the housing company). Lease the coffee machine.
Restaurant. Power for hobs and ovens, space for strong extraction. The classic mistake: fit-out and ventilation ate the whole budget.
Bakery and patisserie. Wiring for an oven that runs up to 16 hours a day, and extraction the residents upstairs will not object to.
Hair salon and barber. Ventilation of its own, water at every station, capacity for equipment and dryers.
Corner shop. Take the round-the-clock shop in Norway we work with: the fridges never switch off, and electricity is billed at business rates.
Pet shop. Storage for feed sacks and an easy spot for unloading deliveries.
Shoe repair and everyday services. A light fit-out; what counts is a sign people notice from the street.
Garage and car wash. An oil separator, waste handling, heating a tall workshop, water and power.
Dentist and clinic. Before the works and before signing, confirm the unit suits a clinic: ceiling height, ventilation, water and drains in every treatment room, and space for the equipment.
Hotel and guesthouse. Business-grade plumbing, equipment tested before the season (air conditioning in 35-degree heat), the small things in each room.
Checklist before the works start
Next steps
Lease checked and some slack in the budget? Read "What it really costs to open a local business in Finland", then "Equipment: buy or lease".
This page is not legal or financial advice. Fit-out prices differ from town to town, so ask for written quotes.
Questions and answers
The power supply, ventilation and extraction, wet areas and drains, and whether an outdoor unit and a sign are allowed. Plus the lease: what becomes of your investment.
Tiles, walls, wiring and windows stay in the unit. What happens to them, and whether you are compensated, depends largely on the lease, so read it before the works.
In our experience, multiply the whole estimate by 1.5, because hidden costs take half of it or more.
In a café or guesthouse the taps and toilets get many times the use. Household kit fails fast, and replacing it costs money and labour.
It varies. The network company charges an extra connection fee for added capacity. Get its price before signing.
An operator with a head of electrical work who has notified Tukes (Electrical Safety Act, section 55). Check the firm in the Tukes register.
In a housing company, alterations are notified to the company and some need its consent. For changes that affect the facade, ask building control as well.
Ring-fence money for marketing and a buffer for six months or more. In cafés the works and ventilation often swallow everything.
Write a precise brief: what goes where, which colour, how many sockets. Spoken agreements are nearly always understood differently.
From our experience, allow roughly twice what the contractor promises, and remember that rent may be running during the works.
We look at your location or lease with you
Would you like a second pair of eyes? Our Madloba Consult team checks the spot you have in mind on Google Maps and walks you through this guide's questions before anything is signed. Legal advice is not part of it: a lawyer reads the contract. Do you run a business in Finland? Terms and prices are on Advertise on SuomiGuide, along with the request form.
Share
Save



0 comments
Log in to leave a comment